Appendix-I-A Fee
Sl. No. | Details | Amount |
---|---|---|
1. | Application fee | Rs.10/- per application |
2. | Scrutiny fee in respect of application for planning permission and revised plans: Scrutiny fee for application of planning permission and revised plans. |
- |
I. | Residential (Pucca Building) | For planning permission application for developments upto 300 sq.m. Re.1/- per sq.m. and developments exceeding 300 sq.m. Rs.1.50 per sq.m. of built up area. When a revised plan is submitted for the first time, Re.1/- per sq.m., for second revision Re.05 per sq.m., for the third revision it is Re.0.25 per sq.m. and for the fourth and subsequent revision no scrutiny fee shall be collected. Recognized charitable institutions / organizations serving the poor, orphanages, institutions for mentally retarded children, which are run for the welfare of the society, shall pay the scrutiny fee only. Scrutiny for revised drawing received from these institutions without any change in the shape of buildings or arrangement of buildings involving minor signature, small corrections in dimension, correction in plot to tally with document etc., will not attract this levy. However, these institutions shall pay scrutiny fee when submitting revised plans involving additional floors. |
II. | Thatched building/hut | Rs.50/- for huts of floor area up to 50.sq.m and; Rs.100/- for floor area exceeding 50sq.m. |
Continued from pre- page (Fees) | ||
III. | (a) Commercial | Three times of the rate of Residential use. |
(b) Industrial | Two times. | |
(c) Institutional | Two times. | |
IV. | Lay – outs / Sub-divisions | Scrutiny fee of Re. 0.50 per sq.m. For revision of approved lay-out, it shall Re.0.25 per sq.m. |
3. | Service Charge for issue of issue of No-Objection Certificates and other certificates. | Rs.10/- shall be collected as service charges for issue of NOCs and Other Certificates. |
4. | Miscellaneous: | - |
(a) | Construction of well/tube-well/ | Rs.25/- each bore well |
(b) | (i) Construction of water-closet | Rs.25/- each |
(ii) Construction of Septic tank | Rs.25/- and Rs.50/-each for residential & Commercial/industrial use respectively. | |
(iii) Construction of Septic tank anaerobic filter | Rs.150/- for residential and Rs.300/- for commercial/industrial use respectively. | |
(c) | Construction of compound Wall not exceeding 2.50 m. in Height. | Rs.10/- per 10 running meter. |
(d) | Construction of drain | Rs.6/- per 10 running meter. |
(e) | Provision of doors on external Sides | Rs.10/- per opening. |
(f) | Provision of windows on external sides. | Rs.5/- per opening. |
5. | Revalidation of sanction before expiry | Half of the rate prescribed for fresh sanction. |
6. | Site Clearance certificate | Rs.1 per sqft of land area |
7. | Regularisation of Layout /Plots | As per the Notification of G.O for regularisation of Unapproved layouts |
Back To Previous Page | Page last updated date: 09-11-2024